The investment proposal concerns the construction, installation and operation of a solar power plant with a capacity of 200MW, an energy storage unit with a capacity of 100MW with Li-ion batteries as well as the installation of a unit for the production of Green Hydrogen with electrolyte, with a capacity of 50MW. The solar power plant will produce a total of 388GWh of energy per year and will contribute in the long term to the increase of the share of electricity production from Renewable Energy Sources.